First need to drill 5 holes and apply M3 threads to it.
Use M3 screws to fix nozzle changer to plate.
Drilling plan you find in attached PDF
Picture shows how to connect the valve to air pressure tubes and controller port.
Nozzle changer gets connected to CL feeder air pressure regulator.
Put a T-tube connector in line with CL feeder air supply and connect valve input to it.
Valve electrical connection route to S7 connector on V2 controller.
Open PNP strategy settings and enable 19 slot changer
Use open 19slot changer to check if nozzle changer lock opens. Then add mechanical positions for each nozzle center, down positions...
All must be on same X/Y position!